In above shown graph,
minute-wise comparative strengths of the five birds have been plotted
on Y-axis and time has been shown on X-axis.
The
time duration is from 10:00 hrs to 14:00 hrs. Though, the actual data
is for "Every minute" in sent report, but due to space constrains of
the screen, the graph has been plotted at an interval of 4-minutes.
This time interval in the shown graph may be decreased or increased by
yourself in MS-Excel while creating graph. |
The concerned report
would normally be sent as a simple text file containing "Strength
values" only (and not as a graph). The various columns of the report
would be delimited with a "comma". Thus, data presented in that report
may easily be imported in MS-Excel by your-self to create graphs (as
shown above or in various other formats), if you wish to graphically
visualize the comparative strengths of five birds.
|